Residential Building Permits

Construction or alteration of a residential structure requiring permits include cutting away any wall, partition, or portion of the building; the removal or cutting of any structural beam; the removal or change of any required means of egress, or rearrangement of parts of the structure affecting the egress requirements.

Change of use alterations:

Construction of additions:

Other structures and alterations:

Demolition or removal of a structure and moving a lot line that affects an existing structure also require permits.

​Scheduling Building, Electrical, Gas, Mechanical & Plumbing Inspections

Inspections are scheduled through Permits & Inspections online permitting service, which allows contractors and homeowners to schedule, cancel or reschedule inspections. Relevant information and inspection results can also be reviewed. The system is available 24 hours a day, seven days a week.

Inspections can be scheduled up to five working days in advance of the desired inspection date; however, they must be scheduled PRIOR to 8 a.m. for the day desired. All inspections scheduled after 8 a.m. will not be available for a same-day inspection. Schedule inspections no later than 7 a.m. the day the inspection is desired to assure the information will be recorded in time.​

After an inspection has been scheduled, inspectors may be contacted between 8 and 9 a.m. the day of the inspection. The inspectors will arrange their daily work schedules and do not know what inspections have been requested prior to the inspection date.